How BIM Helps THROUGH THE Construction Phase

Drag to rearrange sections
Rich Text Content
Statistically, a surprisingly high percentage of construction projects review budget and/or as time passes upon completion. This is usually a consequence of the fact that the drawings produced prior to the start of construction process end up significantly not the same as the As Fitted Drawings especially as far as the 3D M&E (MEP) Coordinated Drawings are worried. Here is in which a BIM approach might help through the construction phase. Some of the key points that stand out as answers to the title questions are:

? BIM is a form of iterative design, where atop exactly the same model you can include more details, more info, phase out the project, produce countless drawings and schedules. When along with the architectural BIM Modeling you insert MEP (M&E) BIM information you have a much clearer view of the project as a whole. This results in a clearer view through the construction phase of the project.

? With BIM, producing 3D M&E (MEP) Coordinated Drawings is straightforward. These drawings permit the coordination of the multiple services involved in any building, HVAC, plumbing, electrical systems along with other public health systems with the structural and architectural (interior finishes, facades, partitions, etc.) elements.

? When working in a true 3D environment the engineering specialists can ensure that the proposed solution is viable in the real world and that those drawings will not be amended once they go into construction.

? BIM Modeling enables anyone to view the model in 3D, like the builders and installation workers. If at any point an inaccuracy is spotted, once the model is adjusted everyone sees the updates. That is even more possible with shared models so for example when using a cloud based applications, such as for example Autodesk 360, all of the documents and models come in one place.

? MEP (M&E) Prefabrication Models and Drawings could be produced much quicker and more reliably from coordinated 3D models. After the models come in place they could be checked for interferences and spatially coordinated using Autodesk's Navisworks tool before being taken into specialised fabrication software.

? MEP installers know exactly what services will be accessed by which access hatched as that is all shown in the MEP (M&E) BIM model. Equally MEP installers can see what areas they ought to keep services out of, either to reduce fire risks, facilitate future access or even to allow future construction phases to be implemented.

? By the end of the construction and installation phase, both architecture team and client can make direct comparisons between your original drawings and the As Fitted Drawings. If the circumstances on the site want it, any changes might easily be implemented in the BIM model through the entire construction process meaning that the As Fitted Drawings have become likely to match very closely.


Finally, significant cost savings can be achieved by the end of the project once the facility management departments get a comprehensive and exhaustive set of drawings and instructions. In BIM Surveys Halesown using BIM Modeling, the exploitation and maintenance costs through the entire lifetime of the project are reduced, that is possibly the goal of any project.